IAC Assessment: BS0043
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2014
Principal Product Frozen Seafood
NAICS 311710 - Seafood Product Preparation and Packaging
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $50,000,000-$100,000,000
# of Employees 325
Plant Area (Sq.Ft.) 80,000
Annual Production 200,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) AK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $982,181 7,223,440 kWh $0.14
Electricity Demand $118,051 19,199 kW-months/year $6.15
Electricity Fees $2,471 - $ -
Fuel Oil #2 $324,138 11,576 MMBtu $28.00
TOTAL ENERGY COSTS $1,426,841
RECOMMENDED SAVINGS* $245,457 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $193,256
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$63,855
Cost:
$15,000
$63,855 469,524 - - - - $63,855
469,524
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,916
Cost:
$19,760
$7,146 52,542 $1,770 288 - - $7,146
52,542
kWh
$1,770
288
kW-months/year
-
-
MMBtu
03: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$111,915
Cost:
$69,000
$(-38,759) (-284,990) $(-9,736) (-1,583) $160,410 5,729 $(-38,759)
(-284,990)
kWh
$(-9,736)
(-1,583)
kW-months/year
$160,410
5,729
MMBtu
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$13,411
Cost:
$5,075
$13,411 98,610 - - - - $13,411
98,610
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.5121 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH Savings:
$13,508
Cost:
$17,493
$12,985 95,481 $523 85 - - $12,985
95,481
kWh
$523
85
kW-months/year
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,075
Cost:
$429
$4,075 29,963 - - - - $4,075
29,963
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,042
Cost:
$52,954
$21,695 159,520 $1,347 219 - - $21,695
159,520
kWh
$1,347
219
kW-months/year
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,340
Cost:
$981
$2,340 17,203 - - - - $2,340
17,203
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,381
Cost:
$7,554
$3,381 24,859 - - - - $3,381
24,859
kWh
-
-
kW-months/year
-
-
MMBtu
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,014
Cost:
$1,242
$988 7,267 $26 4 - - $988
7,267
kWh
$26
4
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$245,457
Cost:
$189,488
$91,117 669,979 $(-6,070) (-987) $160,410 5,729 $91,117
669,979
kWh
$(-6,070)
(-987)
kW-months/year
$160,410
5,729
MMBtu
TOTAL IMPLEMENTED Savings:
$193,256
Cost:
$89,504
$42,582 313,107 $(-9,736) (-1,583) $160,410 5,729 $42,582
313,107
kWh
$(-9,736)
(-1,583)
kW-months/year
$160,410
5,729
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2