Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Boise State University |
---|---|
Assessment Year | 2014 |
Principal Product | Frozen Seafood |
NAICS | 311710 - Seafood Product Preparation and Packaging |
SIC | 2092 - Fresh Or Frozen Prepared Fish |
Sales | $50,000,000-$100,000,000 |
# of Employees | 325 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 200,000,000 Pounds |
Production Hrs. Annual | 7,488 |
Location (State) | AK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $982,181 | 7,223,440 | kWh | $0.14 |
Electricity Demand | $118,051 | 19,199 | kW-months/year | $6.15 |
Electricity Fees | $2,471 | - | $ | - |
Fuel Oil #2 | $324,138 | 11,576 | MMBtu | $28.00 |
TOTAL ENERGY COSTS | $1,426,841 | |||
RECOMMENDED SAVINGS* | $245,457 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $193,256 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Electricity Usage | Electricity Demand | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $63,855 Cost: $15,000 |
$63,855 | 469,524 | - | - | - | - |
$63,855 469,524 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $8,916 Cost: $19,760 |
$7,146 | 52,542 | $1,770 | 288 | - | - |
$7,146 52,542 kWh |
$1,770 288 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) |
Savings: $111,915 Cost: $69,000 |
$(-38,759) | (-284,990) | $(-9,736) | (-1,583) | $160,410 | 5,729 |
$(-38,759) (-284,990) kWh |
$(-9,736) (-1,583) kW-months/year |
$160,410 5,729 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $13,411 Cost: $5,075 |
$13,411 | 98,610 | - | - | - | - |
$13,411 98,610 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.5121 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH |
Savings: $13,508 Cost: $17,493 |
$12,985 | 95,481 | $523 | 85 | - | - |
$12,985 95,481 kWh |
$523 85 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $4,075 Cost: $429 |
$4,075 | 29,963 | - | - | - | - |
$4,075 29,963 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $23,042 Cost: $52,954 |
$21,695 | 159,520 | $1,347 | 219 | - | - |
$21,695 159,520 kWh |
$1,347 219 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,340 Cost: $981 |
$2,340 | 17,203 | - | - | - | - |
$2,340 17,203 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,381 Cost: $7,554 |
$3,381 | 24,859 | - | - | - | - |
$3,381 24,859 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,014 Cost: $1,242 |
$988 | 7,267 | $26 | 4 | - | - |
$988 7,267 kWh |
$26 4 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $245,457 Cost: $189,488 |
$91,117 | 669,979 | $(-6,070) | (-987) | $160,410 | 5,729 | $91,117 669,979 kWh |
$(-6,070) (-987) kW-months/year |
$160,410 5,729 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $193,256 Cost: $89,504 |
$42,582 | 313,107 | $(-9,736) | (-1,583) | $160,410 | 5,729 | $42,582 313,107 kWh |
$(-9,736) (-1,583) kW-months/year |
$160,410 5,729 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Electricity Usage | Electricity Demand | Fuel Oil #2 |