IAC logo
IAC Assessment: BS0046
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0046
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2014
Principal Product Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $50,000,000-$100,000,000
# of Employees 14
Plant Area (Sq.Ft.) 3,049,200
Annual Production 125,000,000 Units
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,207,482 22,768,434 kWh $0.05
Electricity Demand $259,754 49,121 kW-months/year $5.29
Natural Gas $13,634 1,936 MMBtu $7.04
Wood $1,950,000 654,898 MMBtu $2.98
TOTAL ENERGY COSTS $3,430,870
RECOMMENDED SAVINGS* $105,710 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $98,208
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Wood Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,312
Cost:
$58,240
$21,282 418,794 $4,110 778 - - $920 - - - $21,282
418,794
kWh
$4,110
778
kW-months/year
-
-
MMBtu
$920
-
$
-
-
Tgal
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,053
Cost:
$30
$3,053 40,241 - - - - - - - - $3,053
40,241
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$876
Cost:
$2,756
$771 14,452 $105 20 - - - - - - $771
14,452
kWh
$105
20
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,860
Cost:
$9,526
$5,794 109,325 $66 13 - - - - - - $5,794
109,325
kWh
$66
13
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$338
Cost:
$300
$338 6,386 - - - - - - - - $338
6,386
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$8,235
Cost:
$752
$8,235 155,379 - - - - - - - - $8,235
155,379
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$401
Cost:
$922
$354 6,663 $48 9 - - - - - - $354
6,663
kWh
$48
9
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
08: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$25,901
Cost:
$50,324
- - - - $15,626 5,250 - - $10,275 - -
-
kWh
-
-
kW-months/year
$15,626
5,250
MMBtu
-
-
$
$10,275
-
Tgal
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$9,395
Cost:
$84
$7,974 156,947 $1,421 269 - - - - - - $7,974
156,947
kWh
$1,421
269
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
10: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$91
Cost:
$341
- - - - $91 31 - - - - -
-
kWh
-
-
kW-months/year
$91
31
MMBtu
-
-
$
-
-
Tgal
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$581
Cost:
$1,533
- - - - $581 195 - - - - -
-
kWh
-
-
kW-months/year
$581
195
MMBtu
-
-
$
-
-
Tgal
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$723
Cost:
$3,015
- - - - $723 243 - - - - -
-
kWh
-
-
kW-months/year
$723
243
MMBtu
-
-
$
-
-
Tgal
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,944
Cost:
$70,000
$21,092 394,375 $2,852 540 - - - - - - $21,092
394,375
kWh
$2,852
540
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$105,710
Cost:
$197,823
$68,892 1,302,562 $8,602 1,629 $17,021 5,719 $920 - $10,275 - $68,892
1,302,562
kWh
$8,602
1,629
kW-months/year
$17,021
5,719
MMBtu
$920
-
$
$10,275
-
Tgal
TOTAL IMPLEMENTED Savings:
$98,208
Cost:
$183,449
$62,760 1,186,851 $8,536 1,616 $15,717 5,281 $920 - $10,275 - $62,760
1,186,851
kWh
$8,536
1,616
kW-months/year
$15,717
5,281
MMBtu
$920
-
$
$10,275
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Wood Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Wood Ancillary Material Cost Water Consumption