IAC logo
IAC Assessment: BS0047
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0047
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2015
Principal Product Computer Terminal and Other Computer Peripheral Equipment Manufacturing
NAICS 334118 - Computer Terminal and Other Computer Peripheral Equipment Manufacturing
SIC 3577 - Computer Peripheral Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 370
Plant Area (Sq.Ft.) 139,000
Annual Production 700,000 Pieces
Production Hrs. Annual 6,570
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $194,497 2,988,960 kWh $0.07
Electricity Demand $48,285 8,957 kW-months/year $5.39
Natural Gas $30,855 3,859 MMBtu $8.00
TOTAL ENERGY COSTS $273,637
RECOMMENDED SAVINGS* $65,192 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $536
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$536
Cost:
$15
$480 7,379 $56 10 - - $480
7,379
kWh
$56
10
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,127
Cost:
$32,541
$3,914 60,213 $1,214 225 - - $3,914
60,213
kWh
$1,214
225
kW-months/year
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,021
Cost:
$495
$1,021 15,714 - - - - $1,021
15,714
kWh
-
-
kW-months/year
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$20,278
Cost:
$200
$20,278 311,962 - - - - $20,278
311,962
kWh
-
-
kW-months/year
-
-
$
05: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$38,230
Cost:
$27,200
$(-1,426) (-21,944) - - $39,656 - $(-1,426)
(-21,944)
kWh
-
-
kW-months/year
$39,656
-
$
TOTAL RECOMMENDED Savings:
$65,192
Cost:
$60,451
$24,266 373,324 $1,270 236 $39,656 - $24,266
373,324
kWh
$1,270
236
kW-months/year
$39,656
-
$
TOTAL IMPLEMENTED Savings:
$536
Cost:
$15
$480 7,379 $56 10 - - $480
7,379
kWh
$56
10
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost