Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2015
Principal Product Metal Heat Treating
NAICS 332811 - Metal Heat Treating
SIC 3399 - Primary Metal Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 16
Plant Area (Sq.Ft.) 17,000
Annual Production 173,680 Pounds
Production Hrs. Annual 4,160
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $265,220 3,700,829 kWh $0.07
Electricity Demand $84,528 13,488 kW-months/year $6.27
Natural Gas $59,647 7,992 MMBtu $7.46
TOTAL ENERGY COSTS $409,395
RECOMMENDED SAVINGS* $4,321 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,692
Cost:
$15
$1,450 20,133 $242 39 $1,450
20,133
kWh
$242
39
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$879
Cost:
$910
$753 10,460 $126 20 $753
10,460
kWh
$126
20
kW-months/year
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$826
Cost:
$968
$826 11,474 - - $826
11,474
kWh
-
-
kW-months/year
04: 2.2514 COVER OPEN TANKS Savings:
$44
Cost:
$50
$10 136 $34 5 $10
136
kWh
$34
5
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$660
Cost:
$3,120
$531 7,379 $129 21 $531
7,379
kWh
$129
21
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$220
Cost:
$600
$220 3,060 - - $220
3,060
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$4,321
Cost:
$5,663
$3,790 52,642 $531 85 $3,790
52,642
kWh
$531
85
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand