IAC Assessment: BS0054
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0054
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2015
Principal Product Metal Parts
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 53,000
Annual Production 300,000 Pieces
Production Hrs. Annual 7,900
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,263 3,261,060 kWh $0.04
Electricity Demand $19,203 5,727 kW-months/year $3.35
Natural Gas $10,447 1,265 MMBtu $8.26
TOTAL ENERGY COSTS $164,913
RECOMMENDED SAVINGS* $7,085 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $701
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$741
Cost:
$1,255
$643 15,677 - - $98 - $643
15,677
kWh
-
-
kW-months/year
$98
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29
Cost:
$45
$29 700 - - - - $29
700
kWh
-
-
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$597
Cost:
$4,830
$486 11,862 $111 33 - - $486
11,862
kWh
$111
33
kW-months/year
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$268
Cost:
$9
$268 6,522 - - - - $268
6,522
kWh
-
-
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$75
Cost:
$374
$67 1,645 $8 2 - - $67
1,645
kWh
$8
2
kW-months/year
-
-
$
06: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$5,375
Cost:
$50,351
$5,375 131,093 - - - - $5,375
131,093
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$7,085
Cost:
$56,864
$6,868 167,499 $119 35 $98 - $6,868
167,499
kWh
$119
35
kW-months/year
$98
-
$
TOTAL IMPLEMENTED Savings:
$701
Cost:
$5,249
$582 14,207 $119 35 - - $582
14,207
kWh
$119
35
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes