Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2015
Principal Product Steel Foundries (except investment)
NAICS 331513 - Steel Foundries (except Investment)
SIC 3325 - Steel Foundries, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 200,000
Annual Production 80,000 Pieces
Production Hrs. Annual 6,792
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $511,354 7,140,460 kWh $0.07
Electricity Demand $208,126 26,238 kW-months/year $7.93
Natural Gas $124,150 14,960 MMBtu $8.30
TOTAL ENERGY COSTS $843,630
RECOMMENDED SAVINGS* $27,680 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,465
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,229
Cost:
$46,340
$15,259 211,931 $2,970 374 - - $15,259
211,931
kWh
$2,970
374
kW-months/year
-
-
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,215
Cost:
$10,715
- - - - $4,215 517 -
-
kWh
-
-
kW-months/year
$4,215
517
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,088
Cost:
$160
$4,255 59,091 $833 105 - - $4,255
59,091
kWh
$833
105
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$148
Cost:
$15
$142 1,976 $6 1 - - $142
1,976
kWh
$6
1
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$27,680
Cost:
$57,230
$19,656 272,998 $3,809 480 $4,215 517 $19,656
272,998
kWh
$3,809
480
kW-months/year
$4,215
517
MMBtu
TOTAL IMPLEMENTED Savings:
$23,465
Cost:
$46,515
$19,656 272,998 $3,809 480 - - $19,656
272,998
kWh
$3,809
480
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas