IAC Assessment: BS0072
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0072
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2016
Principal Product Specialty Cut Lumber
NAICS 321912 - Cut Stock, Resawing Lumber, and Planing
SIC 2421 - Sawmills And Planing Mills, General
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 83,190
Annual Production 1,650 Thousand Feet
Production Hrs. Annual 2,340
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,363 658,783 kWh $0.05
Electricity Demand $19,725 3,597 kW-months/year $5.48
Electricity Fees $6,168 - $ -
LPG $15,963 1,021 MMBtu $15.64
TOTAL ENERGY COSTS $74,219
RECOMMENDED SAVINGS* $7,831 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$233
Cost:
$48
$233 4,325 - - - - - - $233
4,325
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$56
Cost:
$47
$56 1,039 - - - - - - $56
1,039
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$217
Cost:
$63
- - - - - - $217 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$217
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,231
Cost:
$15,400
$2,670 49,591 $1,561 255 - - - - $2,670
49,591
kWh
$1,561
255
kW-months/year
-
-
MMBtu
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$240
Cost:
$413
$240 4,461 - - - - - - $240
4,461
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$547
Cost:
$582
$547 10,162 - - - - - - $547
10,162
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,023
Cost:
$3,260
$1,488 27,640 $1,469 240 $(-880) (-124) $(-54) - $1,488
27,640
kWh
$1,469
240
kW-months/year
$(-880)
(-124)
MMBtu
$(-54)
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$284
Cost:
$1,323
$180 3,342 $104 17 - - - - $180
3,342
kWh
$104
17
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$7,831
Cost:
$21,136
$5,414 100,560 $3,134 512 $(-880) (-124) $163 - $5,414
100,560
kWh
$3,134
512
kW-months/year
$(-880)
(-124)
MMBtu
$163
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes