IAC logo
IAC Assessment: BS0073
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0073
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2016
Principal Product Packaged Frozen Food
NAICS 311412 - Frozen Specialty Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 233
Plant Area (Sq.Ft.) 110,000
Annual Production 100,000,000 Pounds
Production Hrs. Annual 6,210
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $422,366 9,590,800 kWh $0.04
Electricity Demand $163,175 20,120 kW-months/year $8.11
Natural Gas $498,235 132,751 MMBtu $3.75
TOTAL ENERGY COSTS $1,083,776
RECOMMENDED SAVINGS* $6,853 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$151
Cost:
$2,312
$111 2,534 $40 5 - - $111
2,534
kWh
$40
5
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$506
Cost:
$960
$404 9,180 $102 13 - - $404
9,180
kWh
$102
13
kW-months/year
-
-
MMBtu
03: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$419
Cost:
$116
$419 9,513 - - - - $419
9,513
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$108
Cost:
$47
$82 1,865 $26 3 - - $82
1,865
kWh
$26
3
kW-months/year
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,122
Cost:
$220
$1,692 38,456 $430 53 - - $1,692
38,456
kWh
$430
53
kW-months/year
-
-
MMBtu
06: 2.2521 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS Savings:
$582
Cost:
$316
- - - - $582 155 -
-
kWh
-
-
kW-months/year
$582
155
MMBtu
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,966
Cost:
$15,800
- - - - $2,966 791 -
-
kWh
-
-
kW-months/year
$2,966
791
MMBtu
TOTAL RECOMMENDED Savings:
$6,853
Cost:
$19,771
$2,708 61,548 $597 74 $3,548 946 $2,708
61,548
kWh
$597
74
kW-months/year
$3,548
946
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas