IAC logo
IAC Assessment: BS0074
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0074
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2016
Principal Product Liquid Animal Supplements
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 21
Plant Area (Sq.Ft.) 24,000
Annual Production 73,800 Tons
Production Hrs. Annual 5,330
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,512 649,101 kWh $0.06
Electricity Demand $10,339 2,237 kW-months/year $4.62
Electricity Fees $608 - $ -
Natural Gas $29,524 4,034 MMBtu $7.32
Fuel Oil #2 $144,072 9,690 MMBtu $14.87
TOTAL ENERGY COSTS $222,055
RECOMMENDED SAVINGS* $6,806 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,896
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$249
Cost:
$117
$249 4,315 - - - - $249
4,315
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$283
Cost:
$448
$283 4,905 - - - - $283
4,905
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.1224 REPLACE BOILER Savings:
$2,331
Cost:
$14,391
- - - - $2,331 330 -
-
kWh
-
-
kW-months/year
$2,331
330
MMBtu
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$2,326
Cost:
$5,073
- - - - $2,326 329 -
-
kWh
-
-
kW-months/year
$2,326
329
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$111
Cost:
$343
$97 1,683 $14 3 - - $97
1,683
kWh
$14
3
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$600
Cost:
$2,800
$478 8,263 $122 26 - - $478
8,263
kWh
$122
26
kW-months/year
-
-
MMBtu
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$199
Cost:
$14
$29 510 - - $170 24 $29
510
kWh
-
-
kW-months/year
$170
24
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$530
Cost:
$7
$530 9,182 - - - - $530
9,182
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$177
Cost:
$483
$177 3,068 - - - - $177
3,068
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$6,806
Cost:
$23,676
$1,843 31,926 $136 29 $4,827 683 $1,843
31,926
kWh
$136
29
kW-months/year
$4,827
683
MMBtu
TOTAL IMPLEMENTED Savings:
$5,896
Cost:
$20,519
$1,239 21,470 - - $4,657 659 $1,239
21,470
kWh
-
-
kW-months/year
$4,657
659
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas