IAC logo
IAC Assessment: BS0084
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0084
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2016
Principal Product Dimensional Lumber
NAICS 321912 - Cut Stock, Resawing Lumber, and Planing
SIC 2421 - Sawmills And Planing Mills, General
Sales $50,000,000-$100,000,000
# of Employees 155
Plant Area (Sq.Ft.) 448,246
Annual Production 52,000 Thousand Feet
Production Hrs. Annual 4,080
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $570,707 7,836,551 kWh $0.07
Electricity Demand $186,283 29,898 kW-months/year $6.23
LPG $42,000 7,278 MMBtu $5.77
TOTAL ENERGY COSTS $798,990
RECOMMENDED SAVINGS* $40,905 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$31,444
Cost:
$31,350
$4,940 67,676 $1,598 257 - - $24,905 - $4,940
67,676
kWh
$1,598
257
kW-months/year
-
-
MMBtu
$24,905
-
$
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,854
Cost:
$15
$3,854 52,800 - - - - - - $3,854
52,800
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,738
Cost:
$825
$3,779 51,765 $960 154 - - - - $3,779
51,765
kWh
$960
154
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$751
Cost:
$243
$751 10,291 - - - - - - $751
10,291
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$118
Cost:
$264
- - - - $118 20 - - -
-
kWh
-
-
kW-months/year
$118
20
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$40,905
Cost:
$32,697
$13,325 182,532 $2,558 411 $118 20 $24,905 - $13,325
182,532
kWh
$2,558
411
kW-months/year
$118
20
MMBtu
$24,905
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost