IAC Assessment: BS0095
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0095
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2017
Principal Product Trailers
NAICS 336212 - Truck Trailer Manufacturing
SIC 3715 - Truck Trailers
Sales $100,000,000-$500,000,000
# of Employees 305
Plant Area (Sq.Ft.) 200,000
Annual Production 1,500 Pieces
Production Hrs. Annual 4,020
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $133,298 2,739,363 kWh $0.05
Electricity Demand $66,159 10,208 kW-months/year $6.48
Electricity Fees $18,655 - $ -
Natural Gas $52,857 7,699 MMBtu $6.87
TOTAL ENERGY COSTS $270,969
RECOMMENDED SAVINGS* $55,989 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,961
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$9,634
Cost:
$1,202
$9,634 197,977 - - - - - - $9,634
197,977
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,164
Cost:
$45,960
$2,784 57,199 $1,380 216 - - - - $2,784
57,199
kWh
$1,380
216
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,935
Cost:
$15,234
$4,555 93,599 $1,380 213 - - - - $4,555
93,599
kWh
$1,380
213
kW-months/year
-
-
$
-
-
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,156
Cost:
$20,491
- - - - $9,156 - - - -
-
kWh
-
-
kW-months/year
$9,156
-
$
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,362
Cost:
$1,171
$3,880 79,666 $1,482 229 - - - - $3,880
79,666
kWh
$1,482
229
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,327
Cost:
$128
$1,290 26,489 $37 6 - - - - $1,290
26,489
kWh
$37
6
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$9,891
Cost:
$13,498
$6,858 147,166 $3,033 468 - - - - $6,858
147,166
kWh
$3,033
468
kW-months/year
-
-
$
-
-
MMBtu
08: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$10,520
Cost:
$21,040
- - - - - - $10,520 1,541 -
-
kWh
-
-
kW-months/year
-
-
$
$10,520
1,541
MMBtu
TOTAL RECOMMENDED Savings:
$55,989
Cost:
$118,724
$29,001 602,096 $7,312 1,132 $9,156 - $10,520 1,541 $29,001
602,096
kWh
$7,312
1,132
kW-months/year
$9,156
-
$
$10,520
1,541
MMBtu
TOTAL IMPLEMENTED Savings:
$10,961
Cost:
$1,330
$10,924 224,466 $37 6 - - - - $10,924
224,466
kWh
$37
6
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas