IAC logo
IAC Assessment: BS0096
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0096
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2017
Principal Product Fabricated Structural Metal
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 55,000
Annual Production 120 Units
Production Hrs. Annual 5,304
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,465 1,204,164 kWh $0.07
Electricity Demand $41,452 4,914 kW-months/year $8.44
Natural Gas $29,024 3,738 MMBtu $7.76
TOTAL ENERGY COSTS $157,941
RECOMMENDED SAVINGS* $5,648 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,341
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,641
Cost:
$1,104
$1,161 15,912 - - - - $480 - $1,161
15,912
kWh
-
-
kW-months/year
-
-
$
$480
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$609
Cost:
$175
$480 6,577 $129 15 - - - - $480
6,577
kWh
$129
15
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$355
Cost:
$412
$355 4,862 - - - - - - $355
4,862
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$152
Cost:
$15
$152 2,080 - - - - - - $152
2,080
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,155
Cost:
$430
$1,155 15,820 - - - - - - $1,155
15,820
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$1,509
Cost:
$6,000
- - $1,509 179 - - - - -
-
kWh
$1,509
179
kW-months/year
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$227
Cost:
$564
$236 3,235 $62 7 $(-71) - - - $236
3,235
kWh
$62
7
kW-months/year
$(-71)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$5,648
Cost:
$8,700
$3,539 48,486 $1,700 201 $(-71) - $480 - $3,539
48,486
kWh
$1,700
201
kW-months/year
$(-71)
-
$
$480
-
$
TOTAL IMPLEMENTED Savings:
$4,341
Cost:
$8,255
$2,232 30,586 $1,700 201 $(-71) - $480 - $2,232
30,586
kWh
$1,700
201
kW-months/year
$(-71)
-
$
$480
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost