IAC Assessment: BS0101
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0101
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2017
Principal Product Lumber and Other Building Materials
NAICS 321912 - Cut Stock, Resawing Lumber, and Planing
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 7,800
Annual Production 135,000 Thousand Feet
Production Hrs. Annual 4,420
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $706,357 21,430,450 kWh $0.03
Electricity Demand $171,817 43,304 kW-months/year $3.97
Electricity Fees $159,994 - $ -
TOTAL ENERGY COSTS $1,038,168
RECOMMENDED SAVINGS* $62,279 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,063
Cost:
$41,435
$9,331 282,761 $1,732 436 - - $9,331
282,761
kWh
$1,732
436
kW-months/year
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,143
Cost:
$525
$4,168 126,306 $1,975 498 - - $4,168
126,306
kWh
$1,975
498
kW-months/year
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,844
Cost:
$25,166
- - - - $10,844 - -
-
kWh
-
-
kW-months/year
$10,844
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,138
Cost:
$1,400
$2,694 81,643 $444 112 - - $2,694
81,643
kWh
$444
112
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$261
Cost:
$660
$261 7,779 - - - - $261
7,779
kWh
-
-
kW-months/year
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$30,830
Cost:
$20,375
$18,271 553,646 $12,559 3,165 - - $18,271
553,646
kWh
$12,559
3,165
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$62,279
Cost:
$89,561
$34,725 1,052,135 $16,710 4,211 $10,844 - $34,725
1,052,135
kWh
$16,710
4,211
kW-months/year
$10,844
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees