IAC Assessment: BS0108
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0108
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2017
Principal Product Perishable Prepared Foods
NAICS 311991 - Perishable Prepared Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 80,000
Annual Production 12,000,000 Units
Production Hrs. Annual 5,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,823,744 52,920,000 kWh $0.05
Electricity Demand $148,281 29,086 kW-months/year $5.10
Electricity Fees $12,743 - $ -
Natural Gas $15,868 12,469 MMBtu $1.27
TOTAL ENERGY COSTS $3,000,636
RECOMMENDED SAVINGS* $18,728 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,587
Cost:
$25,166
- - - - $6,587 - -
-
kWh
-
-
kW-months/year
$6,587
-
$
02: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$3,658
Cost:
$290
$3,658 68,503 - - - - $3,658
68,503
kWh
-
-
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$104
Cost:
$165
$104 1,945 - - - - $104
1,945
kWh
-
-
kW-months/year
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$443
Cost:
$1,238
$443 8,295 - - - - $443
8,295
kWh
-
-
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,696
Cost:
$1,050
$6,806 127,458 $890 175 - - $6,806
127,458
kWh
$890
175
kW-months/year
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$240
Cost:
$270
$199 3,802 $41 8 - - $199
3,802
kWh
$41
8
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$18,728
Cost:
$28,179
$11,210 210,003 $931 183 $6,587 - $11,210
210,003
kWh
$931
183
kW-months/year
$6,587
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees