IAC logo
IAC Assessment: BS0114
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0114
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2018
Principal Product Construction Equipment
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales $50,000,000-$100,000,000
# of Employees 181
Plant Area (Sq.Ft.) 153,000
Annual Production 30,000 Pieces
Production Hrs. Annual 4,100
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,961 1,959,520 kWh $0.05
Electricity Demand $30,651 5,149 kW-months/year $5.95
Electricity Fees $202 - $ -
Natural Gas $78,996 13,617 MMBtu $5.80
LPG $22,398 336 MMBtu $66.66
Fuel Oil #2 $6,312 377 MMBtu $16.74
TOTAL ENERGY COSTS $245,520
RECOMMENDED SAVINGS* $45,164 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,247
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,222
Cost:
$21,742
$(-334) (-6,117) $(-107) (-18) $4,663 805 - - - - $(-334)
(-6,117)
kWh
$(-107)
(-18)
kW-months/year
$4,663
805
MMBtu
-
-
MMBtu
-
-
$
02: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$26,520
Cost:
$21,600
- - - - - - - - $26,520 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$26,520
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$423
Cost:
$250
$322 5,899 $101 17 - - - - - - $322
5,899
kWh
$101
17
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,503
Cost:
$11,880
$(-689) (-12,632) $(-471) (-79) - - $5,663 344 - - $(-689)
(-12,632)
kWh
$(-471)
(-79)
kW-months/year
-
-
MMBtu
$5,663
344
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$601
Cost:
$7
$601 11,017 - - - - - - - - $601
11,017
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$304
Cost:
$337
$304 5,565 - - - - - - - - $304
5,565
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$8,591
Cost:
$166,500
$8,591 157,396 - - - - - - - - $8,591
157,396
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$45,164
Cost:
$222,316
$8,795 161,128 $(-477) (-80) $4,663 805 $5,663 344 $26,520 - $8,795
161,128
kWh
$(-477)
(-80)
kW-months/year
$4,663
805
MMBtu
$5,663
344
MMBtu
$26,520
-
$
TOTAL IMPLEMENTED Savings:
$27,247
Cost:
$22,187
$626 11,464 $101 17 - - - - $26,520 - $626
11,464
kWh
$101
17
kW-months/year
-
-
MMBtu
-
-
MMBtu
$26,520
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 One-time Revenue or Avoided Cost