IAC logo
IAC Assessment: BS0115
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0115
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2018
Principal Product Concrete and Asphalt
NAICS 327320 - Ready-Mix Concrete Manufacturing
SIC 3273 - Ready-mixed Concrete
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 5,219,050
Annual Production 200,000 Tons
Production Hrs. Annual 3,120
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $173,384 2,635,220 kWh $0.07
Electricity Demand $112,537 19,631 kW-months/year $5.73
Natural Gas $262,132 49,899 MMBtu $5.25
TOTAL ENERGY COSTS $548,053
RECOMMENDED SAVINGS* $45,191 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,957
Cost:
$11,662
$6,765 102,499 $1,192 208 $6,765
102,499
kWh
$1,192
208
kW-months/year
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$481
Cost:
$380
$360 5,460 $120 21 $360
5,460
kWh
$120
21
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,068
Cost:
$280
$5,423 82,168 $645 113 $5,423
82,168
kWh
$645
113
kW-months/year
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$977
Cost:
$350
$977 14,800 - - $977
14,800
kWh
-
-
kW-months/year
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,604
Cost:
$144
$1,859 28,116 $745 130 $1,859
28,116
kWh
$745
130
kW-months/year
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,334
Cost:
$1,920
$2,835 42,956 $499 87 $2,835
42,956
kWh
$499
87
kW-months/year
07: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$23,770
Cost:
$8,000
- - $23,770 4,146 -
-
kWh
$23,770
4,146
kW-months/year
TOTAL RECOMMENDED Savings:
$45,191
Cost:
$22,736
$18,219 275,999 $26,972 4,705 $18,219
275,999
kWh
$26,972
4,705
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand