IAC logo
IAC Assessment: BS0124
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0124
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2019
Principal Product Pasta
NAICS 311824 - Dry Pasta, Dough, and Flour Mixes Manufacturing from Purchased Flour
SIC 2041 - Flour And Other Grain Mill Products
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 193,715
Annual Production 52,800,000 Units
Production Hrs. Annual 7,296
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $358,343 4,903,159 kWh $0.07
Electricity Demand $74,471 12,091 kW-months/year $6.16
Natural Gas $161,220 22,707 MMBtu $7.10
TOTAL ENERGY COSTS $594,034
RECOMMENDED SAVINGS* $28,228 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,766
Cost:
$6,213
$4,158 56,953 $609 94 - - $4,158
56,953
kWh
$609
94
kW-months/year
-
-
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$392
Cost:
$1,259
- - - - $392 55 -
-
kWh
-
-
kW-months/year
$392
55
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,609
Cost:
$1,030
$6,609 90,574 - - - - $6,609
90,574
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,460
Cost:
$2,200
$13,240 181,375 $3,220 497 - - $13,240
181,375
kWh
$3,220
497
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$28,228
Cost:
$10,702
$24,007 328,902 $3,829 591 $392 55 $24,007
328,902
kWh
$3,829
591
kW-months/year
$392
55
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas