IAC logo
IAC Assessment: BS0126
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0126
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2019
Principal Product Storage
NAICS 424490 - Other Grocery and Related Products Merchant Wholesalers
SIC 5149 - Groceries And Related Products, Nec
Sales >$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 685,000
Annual Production 29,000,000 Pieces
Production Hrs. Annual 7,452
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $294,642 4,228,180 kWh $0.07
Electricity Demand $79,167 9,590 kW-months/year $8.26
Natural Gas $90,000 172,275 MMBtu $0.52
TOTAL ENERGY COSTS $463,809
RECOMMENDED SAVINGS* $19,413 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$308
Cost:
$53
$257 3,666 $51 6 $257
3,666
kWh
$51
6
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,569
Cost:
$1,440
$2,011 28,741 $558 68 $2,011
28,741
kWh
$558
68
kW-months/year
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$130
Cost:
$20
$77 1,094 $53 6 $77
1,094
kWh
$53
6
kW-months/year
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$16,406
Cost:
$13,000
$16,406 234,368 - - $16,406
234,368
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$19,413
Cost:
$14,513
$18,750 267,870 $663 80 $18,750
267,870
kWh
$663
80
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand