IAC logo
IAC Assessment: BS0130
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0130
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2019
Principal Product Frozen Vegetables
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $100,000,000-$500,000,000
# of Employees 220
Plant Area (Sq.Ft.) 465,506
Annual Production 121,000,000 Pounds
Production Hrs. Annual 4,032
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $355,306 18,167,800 kWh $0.02
Electricity Demand $225,419 43,972 kW-months/year $5.13
Natural Gas $417,225 85,551 MMBtu $4.88
TOTAL ENERGY COSTS $997,950
RECOMMENDED SAVINGS* $37,999 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$395
Cost:
$1,259
- - - - $395 81 -
-
kWh
-
-
kW-months/year
$395
81
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$141
Cost:
$38
$80 3,992 $61 12 - - $80
3,992
kWh
$61
12
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$131
Cost:
$180
$131 6,532 - - - - $131
6,532
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,199
Cost:
$1,230
$1,199 59,942 - - - - $1,199
59,942
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,547
Cost:
$14,646
$4,310 212,265 $3,237 631 - - $4,310
212,265
kWh
$3,237
631
kW-months/year
-
-
MMBtu
06: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$28,587
Cost:
$13,000
$28,587 1,429,359 - - - - $28,587
1,429,359
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$37,999
Cost:
$30,353
$34,306 1,712,090 $3,298 643 $395 81 $34,306
1,712,090
kWh
$3,298
643
kW-months/year
$395
81
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas