IAC logo
IAC Assessment: BS0141
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0141
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2020
Principal Product Particle Board
NAICS 321999 - All Other Miscellaneous Wood Product Manufacturing
SIC 2499 - Wood Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 534,567
Annual Production 130,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $788,034 15,620,046 kWh $0.05
Electricity Demand $55,811 28,268 kW-months/year $1.97
Electricity Fees $117,444 - $ -
Natural Gas $36,879 8,650 MMBtu $4.26
TOTAL ENERGY COSTS $998,168
RECOMMENDED SAVINGS* $56,729 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Water Usage One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Wood Water Usage One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,094
Cost:
$50
$2,896 57,925 $198 100 - - - - - - $2,896
57,925
kWh
$198
100
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$903
Cost:
$3,300
$744 14,878 $159 81 - - - - - - $744
14,878
kWh
$159
81
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$68
Cost:
$55
$68 1,360 - - - - - - - - $68
1,360
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,521
Cost:
$1,100
$1,423 28,463 $98 50 - - - - - - $1,423
28,463
kWh
$98
50
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,407
Cost:
$70,150
$13,641 269,382 $766 388 - - - - - - $13,641
269,382
kWh
$766
388
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$36,736
Cost:
$27,300
- - - - $20,025 13,991 $6,631 2,550 $10,080 - -
-
kWh
-
-
kW-months/year
$20,025
13,991
MMBtu
$6,631
2,550
Tgal
$10,080
-
$
TOTAL RECOMMENDED Savings:
$56,729
Cost:
$101,955
$18,772 372,008 $1,221 618 $20,025 13,991 $6,631 2,550 $10,080 - $18,772
372,008
kWh
$1,221
618
kW-months/year
$20,025
13,991
MMBtu
$6,631
2,550
Tgal
$10,080
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Wood Water Usage One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Wood Water Usage One-time Revenue or Avoided Cost