Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Boise State University |
---|---|
Assessment Year | 2020 |
Principal Product | Particle Board |
NAICS | 321999 - All Other Miscellaneous Wood Product Manufacturing |
SIC | 2499 - Wood Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 15 |
Plant Area (Sq.Ft.) | 534,567 |
Annual Production | 130,000,000 Pieces |
Production Hrs. Annual | 8,736 |
Location (State) | ID |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $788,034 | 15,620,046 | kWh | $0.05 |
Electricity Demand | $55,811 | 28,268 | kW-months/year | $1.97 |
Electricity Fees | $117,444 | - | $ | - |
Natural Gas | $36,879 | 8,650 | MMBtu | $4.26 |
TOTAL ENERGY COSTS | $998,168 | |||
RECOMMENDED SAVINGS* | $56,729 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Wood | Water Usage | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Wood | Water Usage | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,094 Cost: $50 |
$2,896 | 57,925 | $198 | 100 | - | - | - | - | - | - |
$2,896 57,925 kWh |
$198 100 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $903 Cost: $3,300 |
$744 | 14,878 | $159 | 81 | - | - | - | - | - | - |
$744 14,878 kWh |
$159 81 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $68 Cost: $55 |
$68 | 1,360 | - | - | - | - | - | - | - | - |
$68 1,360 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,521 Cost: $1,100 |
$1,423 | 28,463 | $98 | 50 | - | - | - | - | - | - |
$1,423 28,463 kWh |
$98 50 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $14,407 Cost: $70,150 |
$13,641 | 269,382 | $766 | 388 | - | - | - | - | - | - |
$13,641 269,382 kWh |
$766 388 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $36,736 Cost: $27,300 |
- | - | - | - | $20,025 | 13,991 | $6,631 | 2,550 | $10,080 | - |
- - kWh |
- - kW-months/year |
$20,025 13,991 MMBtu |
$6,631 2,550 Tgal |
$10,080 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $56,729 Cost: $101,955 |
$18,772 | 372,008 | $1,221 | 618 | $20,025 | 13,991 | $6,631 | 2,550 | $10,080 | - | $18,772 372,008 kWh |
$1,221 618 kW-months/year |
$20,025 13,991 MMBtu |
$6,631 2,550 Tgal |
$10,080 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Wood | Water Usage | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Wood | Water Usage | One-time Revenue or Avoided Cost |