IAC logo
IAC Assessment: BS0149
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0149
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2021
Principal Product Particle Board
NAICS 321999 - All Other Miscellaneous Wood Product Manufacturing
SIC 2499 - Wood Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 140
Plant Area (Sq.Ft.) 2,064,163
Annual Production 130,000,000 Units
Production Hrs. Annual 8,760
Location (State) MT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,382,504 49,784,668 kWh $0.05
Electricity Demand $549,098 82,127 kW-months/year $6.69
Natural Gas $1,721,267 473,100 MMBtu $3.64
TOTAL ENERGY COSTS $4,652,868
RECOMMENDED SAVINGS* $73,489 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$9,819
Cost:
$23
$8,247 171,811 $1,573 235 $8,247
171,811
kWh
$1,573
235
kW-months/year
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,317
Cost:
$313
$5,790 120,635 $1,527 228 $5,790
120,635
kWh
$1,527
228
kW-months/year
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$23,678
Cost:
$1,000
$19,987 402,960 $3,691 552 $19,987
402,960
kWh
$3,691
552
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,150
Cost:
$13,435
$11,047 230,143 $2,103 314 $11,047
230,143
kWh
$2,103
314
kW-months/year
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$19,525
Cost:
$50
$16,396 341,586 $3,129 468 $16,396
341,586
kWh
$3,129
468
kW-months/year
TOTAL RECOMMENDED Savings:
$73,489
Cost:
$14,821
$61,467 1,267,135 $12,023 1,797 $61,467
1,267,135
kWh
$12,023
1,797
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand