IAC logo
IAC Assessment: BS0151
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0151
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2021
Principal Product Plastic materials
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 34
Plant Area (Sq.Ft.) 74,981
Annual Production 500,000 Units
Production Hrs. Annual 5,070
Location (State) MT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,313 658,873 kWh $0.06
Electricity Demand $21,539 2,731 kW-months/year $7.89
Electricity Fees $34,586 - $ -
Natural Gas $2,700 838 MMBtu $3.22
TOTAL ENERGY COSTS $100,138
RECOMMENDED SAVINGS* $11,530 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,055
Cost:
$2,536
$1,584 25,259 $471 60 $1,584
25,259
kWh
$471
60
kW-months/year
02: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$893
Cost:
$710
$893 14,252 - - $893
14,252
kWh
-
-
kW-months/year
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,310
Cost:
$527
$8,310 132,547 - - $8,310
132,547
kWh
-
-
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$272
Cost:
$522
$198 3,154 $74 9 $198
3,154
kWh
$74
9
kW-months/year
TOTAL RECOMMENDED Savings:
$11,530
Cost:
$4,295
$10,985 175,212 $545 69 $10,985
175,212
kWh
$545
69
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand