IAC Assessment: BS0154
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0154
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2021
Principal Product Aerospace composites
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 49,600
Annual Production 6,000 Units
Production Hrs. Annual 2,210
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $129,516 2,030,080 kWh $0.06
Electricity Demand $36,344 8,385 kW-months/year $4.33
Natural Gas $29,628 5,352 MMBtu $5.54
TOTAL ENERGY COSTS $195,488
RECOMMENDED SAVINGS* $197,884 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,750
Cost:
$3,231
$2,009 31,493 $741 171 - - - - $2,009
31,493
kWh
$741
171
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$679
Cost:
$280
$679 10,637 - - - - - - $679
10,637
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,232
Cost:
$320
$1,962 31,140 $270 62 - - - - $1,962
31,140
kWh
$270
62
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$766
Cost:
$25
$766 12,000 - - - - - - $766
12,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$182,277
Cost:
$204,462
- - - - - - $182,277 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$182,277
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,288
Cost:
$6,000
- - - - $8,288 1,496 - - -
-
kWh
-
-
kW-months/year
$8,288
1,496
MMBtu
-
-
$
07: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$893
Cost:
$710
$893 14,252 - - - - - - $893
14,252
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$197,884
Cost:
$215,028
$6,308 99,522 $1,011 233 $8,288 1,496 $182,277 - $6,308
99,522
kWh
$1,011
233
kW-months/year
$8,288
1,496
MMBtu
$182,277
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material