IAC logo
IAC Assessment: CC0003
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CC0003
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Carolina, Charlotte
Assessment Year 2022
Principal Product Motor Vehicle Seating
NAICS 336360 - Motor Vehicle Seating and Interior Trim Manufacturing
SIC 2396 - Automotive And Apparel Trimmings
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 248,187
Annual Production 37,000 Units
Production Hrs. Annual 4,680
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,379 1,029,120 kWh $0.12
Electricity Demand $1,560 3,007 kW-months/year $0.52
Electricity Fees $(-2,804) - $ -
Natural Gas $22,631 1,886 MMBtu $12.00
TOTAL ENERGY COSTS $139,766
RECOMMENDED SAVINGS* $32,255 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,652
Cost:
$12,041
$28,085 244,215 $187 361 $(-4,620) (-385) $28,085
244,215
kWh
$187
361
kW-months/year
$(-4,620)
(-385)
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,633
Cost:
-
$1,831 15,922 $18 35 $(-216) (-18) $1,831
15,922
kWh
$18
35
kW-months/year
$(-216)
(-18)
MMBtu
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$990
Cost:
-
$990 8,611 - - - - $990
8,611
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,980
Cost:
-
$5,980 52,000 - - - - $5,980
52,000
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$32,255
Cost:
$12,041
$36,886 320,748 $205 396 $(-4,836) (-403) $36,886
320,748
kWh
$205
396
kW-months/year
$(-4,836)
(-403)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas