IAC Assessment: CC0005
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CC0005
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Carolina, Charlotte
Assessment Year 2022
Principal Product Bread
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 150,000
Annual Production 26,500 Tons
Production Hrs. Annual 7,488
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $255,049 7,116,862 kWh $0.04
Electricity Demand $136,776 12,314 kW-months/year $11.11
Electricity Fees $704 - $ -
Natural Gas $345,828 48,770 MMBtu $7.09
TOTAL ENERGY COSTS $738,357
RECOMMENDED SAVINGS* $74,614 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,985
Cost:
$26,500
$7,542 209,511 $3,443 310 - - $7,542
209,511
kWh
$3,443
310
kW-months/year
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,273
Cost:
$1,000
$1,273 35,354 - - - - $1,273
35,354
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,217
Cost:
-
$2,217 61,589 - - - - $2,217
61,589
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,997
Cost:
$6,000
$5,620 156,108 $2,377 214 - - $5,620
156,108
kWh
$2,377
214
kW-months/year
-
-
MMBtu
05: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$4,973
Cost:
$1,500
$2,547 70,761 $2,426 218 - - $2,547
70,761
kWh
$2,426
218
kW-months/year
-
-
MMBtu
06: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$10,225
Cost:
$30,000
- - - - $10,225 1,442 -
-
kWh
-
-
kW-months/year
$10,225
1,442
MMBtu
07: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$36,944
Cost:
$110,000
- - - - $36,944 5,210 -
-
kWh
-
-
kW-months/year
$36,944
5,210
MMBtu
TOTAL RECOMMENDED Savings:
$74,614
Cost:
$175,000
$19,199 533,323 $8,246 742 $47,169 6,652 $19,199
533,323
kWh
$8,246
742
kW-months/year
$47,169
6,652
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas