IAC logo
IAC Assessment: CC0006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CC0006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Carolina, Charlotte
Assessment Year 2022
Principal Product Bread
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 232,850
Annual Production 48,000 Tons
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $537,042 11,207,857 kWh $0.05
Electricity Demand $262,623 21,771 kW-months/year $12.06
Electricity Fees $(-79,159) - $ -
Natural Gas $537,113 74,676 MMBtu $7.19
TOTAL ENERGY COSTS $1,257,619
RECOMMENDED SAVINGS* $123,007 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$12,027
Cost:
$5,000
$8,560 178,347 $3,467 287 - - $8,560
178,347
kWh
$3,467
287
kW-months/year
-
-
MMBtu
02: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$18,077
Cost:
$60,000
- - - - $18,077 2,513 -
-
kWh
-
-
kW-months/year
$18,077
2,513
MMBtu
03: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$51,588
Cost:
$175,000
- - - - $51,588 7,172 -
-
kWh
-
-
kW-months/year
$51,588
7,172
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,854
Cost:
$13,360
$16,160 336,664 $4,694 389 - - $16,160
336,664
kWh
$4,694
389
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$20,461
Cost:
$10,000
$15,221 317,112 $5,240 434 - - $15,221
317,112
kWh
$5,240
434
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$123,007
Cost:
$263,360
$39,941 832,123 $13,401 1,111 $69,665 9,685 $39,941
832,123
kWh
$13,401
1,111
kW-months/year
$69,665
9,685
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas