IAC logo
IAC Assessment: CC0011
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CC0011
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Carolina, Charlotte
Assessment Year 2022
Principal Product Active Pharmaceutical Ingredients
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $100,000,000-$500,000,000
# of Employees 110
Plant Area (Sq.Ft.) 56,800
Annual Production 30,000 Pounds
Production Hrs. Annual 8,520
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $308,821 6,047,392 kWh $0.05
Electricity Demand $135,920 12,243 kW-months/year $11.10
Electricity Fees $1,241 - $ -
Natural Gas $102,772 9,000 MMBtu $11.42
TOTAL ENERGY COSTS $548,754
RECOMMENDED SAVINGS* $20,182 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$754
Cost:
-
$581 11,397 $173 16 - - $581
11,397
kWh
$173
16
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,227
Cost:
$680
$894 17,520 $333 30 - - $894
17,520
kWh
$333
30
kW-months/year
-
-
MMBtu
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,203
Cost:
$5,000
$4,409 87,997 $794 72 - - $4,409
87,997
kWh
$794
72
kW-months/year
-
-
MMBtu
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,746
Cost:
$1,700
$2,107 42,048 $639 58 - - $2,107
42,048
kWh
$639
58
kW-months/year
-
-
MMBtu
05: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$10,252
Cost:
$50,000
$2,361 46,291 - - $7,891 691 $2,361
46,291
kWh
-
-
kW-months/year
$7,891
691
MMBtu
TOTAL RECOMMENDED Savings:
$20,182
Cost:
$57,380
$10,352 205,253 $1,939 175 $7,891 691 $10,352
205,253
kWh
$1,939
175
kW-months/year
$7,891
691
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas