IAC Assessment: CC0014
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CC0014
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Carolina, Charlotte
Assessment Year 2023
Principal Product Polyester Automotive Seating and Headliner Fabric
NAICS 313310 - Textile and Fabric Finishing Mills
SIC 2259 - Knitting Mills, Nec
Sales $50,000,000-$100,000,000
# of Employees 241
Plant Area (Sq.Ft.) 367,000
Annual Production 5,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $645,493 17,535,764 kWh $0.04
Electricity Demand $446,588 33,876 kW-months/year $13.18
Electricity Fees $(-4,720) - $ -
Natural Gas $860,627 136,790 MMBtu $6.29
TOTAL ENERGY COSTS $1,947,987
RECOMMENDED SAVINGS* $110,063 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,512
Cost:
$1,000
$2,356 64,018 $1,156 88 - - $2,356
64,018
kWh
$1,156
88
kW-months/year
-
-
MMBtu
02: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$7,788
Cost:
$800
- - - - $7,788 1,238 -
-
kWh
-
-
kW-months/year
$7,788
1,238
MMBtu
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,768
Cost:
$1,000
$4,768 129,563 - - - - $4,768
129,563
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,527
Cost:
$2,000
$6,527 177,368 - - - - $6,527
177,368
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$41,841
Cost:
$26,106
- - - - $41,841 6,650 -
-
kWh
-
-
kW-months/year
$41,841
6,650
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,695
Cost:
$11,000
$7,721 209,801 $2,974 228 - - $7,721
209,801
kWh
$2,974
228
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$34,932
Cost:
$53,322
$22,194 603,084 $12,738 966 - - $22,194
603,084
kWh
$12,738
966
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$110,063
Cost:
$95,228
$43,566 1,183,834 $16,868 1,282 $49,629 7,888 $43,566
1,183,834
kWh
$16,868
1,282
kW-months/year
$49,629
7,888
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas