IAC Assessment: CC0018
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CC0018
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Carolina, Charlotte
Assessment Year 2023
Principal Product Bubble Wrap, Instapak Film, Jiffylite
NAICS 326112 - Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671 - Paper Coated & Laminated, Packaging
Sales $50,000,000-$100,000,000
# of Employees 140
Plant Area (Sq.Ft.) 164,000
Annual Production 26,455,471 Pounds
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $503,452 13,392,237 kWh $0.04
Electricity Demand $287,019 26,129 kW-months/year $10.98
Electricity Fees $10,854 - $ -
Fuel Oil #2 $240,165 8,248 MMBtu $29.12
TOTAL ENERGY COSTS $1,041,490
RECOMMENDED SAVINGS* $153,005 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu
01: 2.2123 INSULATE FEEDWATER TANK Savings:
$2,497
Cost:
$500
- - - - $2,497 86 -
-
kWh
-
-
kW-months/year
$2,497
86
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$31,506
Cost:
$10,000
$(-994) (-26,162) $(-491) (-45) $32,991 1,133 $(-994)
(-26,162)
kWh
$(-491)
(-45)
kW-months/year
$32,991
1,133
MMBtu
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,158
Cost:
$10,000
$3,695 97,236 $1,463 133 - - $3,695
97,236
kWh
$1,463
133
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,300
Cost:
-
$1,648 43,362 $652 59 - - $1,648
43,362
kWh
$652
59
kW-months/year
-
-
MMBtu
05: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$16,265
Cost:
$70,000
$16,265 428,025 - - - - $16,265
428,025
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$95,279
Cost:
$350,000
$(-73,484) (-1,933,787) $(-71,403) (-6,500) $240,165 8,248 $(-73,484)
(-1,933,787)
kWh
$(-71,403)
(-6,500)
kW-months/year
$240,165
8,248
MMBtu
TOTAL RECOMMENDED Savings:
$153,005
Cost:
$440,500
$(-52,870) (-1,391,326) $(-69,779) (-6,352) $275,653 9,466 $(-52,870)
(-1,391,326)
kWh
$(-69,779)
(-6,352)
kW-months/year
$275,653
9,466
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2