Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The Assessment Recommendation Codes ARC is a system for classifying recommendations.
[Manual]
TOP | ARC | Description | Recommendations Reccs | Recommended $ Savings | Average Payback (yrs) | Implementation Rate Imp Rate | |
---|---|---|---|---|---|---|---|
back | 2.xxxx | 2.xxxx ENERGY MANAGEMENT | 143,852 | $2,053,071,180 | 1.8 | 51.0% | |
back | 2.2xxx | 2.2xxx Thermal Systems | 20,016 | $425,652,769 | 3.0 | 41.8% | |
back | 2.21xx | 2.21xx STEAM | 4,125 | $101,776,261 | 1.3 | 65.3% | |
2.212x | 2.212x Condensate | 868 | $28,742,763 | 1.2 | 53.6% | ||
2.2121 | 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED | 341 | $24,349,380 | 1.2 | 51.4% | ||
2.2122 | 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES | 319 | $952,245 | 1.2 | 56.7% | ||
2.2123 | 2.2123 INSULATE FEEDWATER TANK | 132 | $349,641 | 1.1 | 59.2% | ||
2.2124 | 2.2124 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | 15 | $690,590 | 2.0 | 38.5% | ||
2.2126 | 2.2126 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) | 8 | $294,722 | 0.7 | 37.5% | ||
2.2127 | 2.2127 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | 30 | $1,239,847 | 1.0 | 37.0% | ||
2.2128 | 2.2128 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | 23 | $866,337 | 1.4 | 45.0% |