IAC logo
IAC Assessment: CC0032
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CC0032
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Carolina, Charlotte
Assessment Year 2023
Principal Product Wood Pellets and Industrial Wood Flour
NAICS 321219 - Reconstituted Wood Product Manufacturing
SIC 2493 - Reconstituted Wood Products
Sales $5,000,000-$10,000,000
# of Employees 25
Plant Area (Sq.Ft.) 110,000
Annual Production 42,000 Tons
Production Hrs. Annual 6,240
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $477,255 8,600,018 kWh $0.06
Electricity Demand $399,613 29,160 kW-months/year $13.70
Electricity Fees $(-119,537) - $ -
TOTAL ENERGY COSTS $757,331
RECOMMENDED SAVINGS* $457,022 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$15,760
Cost:
-
$10,656 193,739 $5,104 373 - - $10,656
193,739
kWh
$5,104
373
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,274
Cost:
$7,400
$2,991 54,380 $2,283 167 - - $2,991
54,380
kWh
$2,283
167
kW-months/year
-
-
$
03: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$314,706
Cost:
$1,607,040
$212,778 3,868,699 $101,928 7,440 - - $212,778
3,868,699
kWh
$101,928
7,440
kW-months/year
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$13,869
Cost:
$14,141
$9,377 170,491 $4,492 328 - - $9,377
170,491
kWh
$4,492
328
kW-months/year
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$47,565
Cost:
$84,000
$32,160 584,721 $15,405 1,124 - - $32,160
584,721
kWh
$15,405
1,124
kW-months/year
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$59,248
Cost:
-
$40,059 728,342 $19,189 1,401 - - $40,059
728,342
kWh
$19,189
1,401
kW-months/year
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$600
Cost:
$6,750
- - - - $600 - -
-
kWh
-
-
kW-months/year
$600
-
$
TOTAL RECOMMENDED Savings:
$457,022
Cost:
$1,719,331
$308,020 5,600,372 $148,401 10,832 $600 - $308,020
5,600,372
kWh
$148,401
10,832
kW-months/year
$600
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees