IAC logo
IAC Assessment: CC0035
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CC0035
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Carolina, Charlotte
Assessment Year 2024
Principal Product bottled water
NAICS 312112 - Bottled Water Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $5,000,000-$10,000,000
# of Employees 26
Plant Area (Sq.Ft.) 52,000
Annual Production 18,000 Thousand Gallons
Production Hrs. Annual 4,420
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,434 355,031 kWh $0.10
Electricity Demand $15,878 1,161 kW-months/year $13.67
Electricity Fees $678 - $ -
Natural Gas $6,053 459 MMBtu $13.20
TOTAL ENERGY COSTS $59,043
RECOMMENDED SAVINGS* $34,674 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$1,534
Cost:
$7,000
$845 8,208 $689 50 - - $845
8,208
kWh
$689
50
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,395
Cost:
$4,578
$6,156 59,769 $2,239 164 - - $6,156
59,769
kWh
$2,239
164
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,484
Cost:
$1,000
$8,484 82,368 - - - - $8,484
82,368
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,601
Cost:
$4,550
- - - - $3,601 273 -
-
kWh
-
-
kW-months/year
$3,601
273
MMBtu
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,795
Cost:
$2,800
$4,795 46,553 - - - - $4,795
46,553
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,865
Cost:
-
$5,782 56,134 $2,083 152 - - $5,782
56,134
kWh
$2,083
152
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$34,674
Cost:
$19,928
$26,062 253,032 $5,011 367 $3,601 273 $26,062
253,032
kWh
$5,011
367
kW-months/year
$3,601
273
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu