Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of California, Irvine |
---|---|
Assessment Year | 2022 |
Principal Product | Residential Door Locks and Cabinet Hardware Accessories |
NAICS | 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3429 - Hardware, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 389 |
Plant Area (Sq.Ft.) | 218,600 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 3,060 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $279,304 | 1,386,000 | kWh | $0.20 |
Natural Gas | $15,033 | 1,397 | MMBtu | $10.76 |
LPG | $38,508 | 1 | MMBtu | $38,508.00 |
TOTAL ENERGY COSTS | $332,845 | |||
RECOMMENDED SAVINGS* | $104,906 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | LPG | Personnel Changes | Ancillary Material Cost | Electricity Usage | LPG | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION |
Savings: $33,479 Cost: $80,000 |
- | - | $33,479 | 1 | - | - | - | - |
- - kWh |
$33,479 1 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $27,300 Cost: $24,600 |
$27,300 | 135,486 | - | - | - | - | - | - |
$27,300 135,486 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $18,201 Cost: $1,800 |
$18,201 | 90,329 | - | - | - | - | - | - |
$18,201 90,329 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $12,649 Cost: $30,000 |
$12,649 | 62,776 | - | - | - | - | - | - |
$12,649 62,776 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4325 UPGRADE CONVEYORS |
Savings: $3,825 Cost: $8,040 |
- | - | - | - | $3,825 | - | - | - |
- - kWh |
- - MMBtu |
$3,825 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $3,680 Cost: - |
$3,680 | 18,262 | - | - | - | - | - | - |
$3,680 18,262 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,733 Cost: $2,167 |
$2,733 | 13,563 | - | - | - | - | - | - |
$2,733 13,563 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,717 Cost: $2,625 |
$1,717 | 8,520 | - | - | - | - | - | - |
$1,717 8,520 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $1,322 Cost: $1,350 |
$1,152 | 5,718 | - | - | $77 | - | $93 | - |
$1,152 5,718 kWh |
- - MMBtu |
$77 - $ |
$93 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $104,906 Cost: $150,582 |
$67,432 | 334,654 | $33,479 | 1 | $3,902 | - | $93 | - | $67,432 334,654 kWh |
$33,479 1 MMBtu |
$3,902 - $ |
$93 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | LPG | Personnel Changes | Ancillary Material Cost | Electricity Usage | LPG | Personnel Changes | Ancillary Material Cost |