IAC Assessment: CI0006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CI0006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of California, Irvine
Assessment Year 2022
Principal Product Metal Finishing
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 170,000
Annual Production 50,000 Pieces
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $924,829 7,545,402 kWh $0.12
Electricity Demand $135,770 10,185 kW-months/year $13.33
Natural Gas $514,322 58,422 MMBtu $8.80
LPG $33,825 3,000 MMBtu $11.28
TOTAL ENERGY COSTS $1,608,746
RECOMMENDED SAVINGS* $112,736 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Electricity Usage Electricity Demand Natural Gas LPG
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$28,328
Cost:
$32,800
$28,328 231,104 - - - - - - $28,328
231,104
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
02: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$26,391
Cost:
$90,000
$(-7,434) (-60,653) - - - - $33,825 3,000 $(-7,434)
(-60,653)
kWh
-
-
kW-months/year
-
-
MMBtu
$33,825
3,000
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$22,728
Cost:
$6,000
$16,330 133,230 $6,398 480 - - - - $16,330
133,230
kWh
$6,398
480
kW-months/year
-
-
MMBtu
-
-
MMBtu
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$14,859
Cost:
$82,655
$7,469 60,938 $7,390 554 - - - - $7,469
60,938
kWh
$7,390
554
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.1224 REPLACE BOILER Savings:
$13,563
Cost:
$27,000
$(-25,698) (-209,664) $(-1,074) (-81) $40,335 4,582 - - $(-25,698)
(-209,664)
kWh
$(-1,074)
(-81)
kW-months/year
$40,335
4,582
MMBtu
-
-
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,279
Cost:
$500
$4,279 34,913 - - - - - - $4,279
34,913
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,588
Cost:
$1,342
$2,140 17,459 $448 34 - - - - $2,140
17,459
kWh
$448
34
kW-months/year
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$112,736
Cost:
$240,297
$25,414 207,327 $13,162 987 $40,335 4,582 $33,825 3,000 $25,414
207,327
kWh
$13,162
987
kW-months/year
$40,335
4,582
MMBtu
$33,825
3,000
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas LPG Electricity Usage Electricity Demand Natural Gas LPG