IAC logo
IAC Assessment: CI0009
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CI0009
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of California, Irvine
Assessment Year 2023
Principal Product Filters
NAICS 333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564 - Blowers And Fans
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 125,000
Annual Production 4,500,000 Pieces
Production Hrs. Annual 4,680
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,670 761,333 kWh $0.08
Electricity Demand $43,804 1,983 kW-months/year $22.09
Natural Gas $43,092 2,862 MMBtu $15.05
TOTAL ENERGY COSTS $149,566
RECOMMENDED SAVINGS* $97,871 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$46,339
Cost:
$196,478
$17,021 206,822 $29,318 1,327 $17,021
206,822
kWh
$29,318
1,327
kW-months/year
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$11,591
Cost:
$41,000
$11,591 140,850 - - $11,591
140,850
kWh
-
-
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,199
Cost:
$1,500
$7,386 89,749 $3,813 173 $7,386
89,749
kWh
$3,813
173
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,281
Cost:
$14,880
$5,698 69,232 $4,583 208 $5,698
69,232
kWh
$4,583
208
kW-months/year
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$9,574
Cost:
-
$9,574 116,329 - - $9,574
116,329
kWh
-
-
kW-months/year
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,832
Cost:
$4,725
$2,678 32,545 $2,154 98 $2,678
32,545
kWh
$2,154
98
kW-months/year
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$4,055
Cost:
$2,500
$1,188 14,439 $2,867 130 $1,188
14,439
kWh
$2,867
130
kW-months/year
TOTAL RECOMMENDED Savings:
$97,871
Cost:
$261,083
$55,136 669,966 $42,735 1,935 $55,136
669,966
kWh
$42,735
1,935
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand