IAC logo
IAC Assessment: CI0017
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CI0017
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of California, Irvine
Assessment Year 2023
Principal Product Packaged Food Products
NAICS 311991 - Perishable Prepared Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $100,000,000-$500,000,000
# of Employees 145
Plant Area (Sq.Ft.) 68,000
Annual Production 15,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $435,603 3,794,897 kWh $0.11
Electricity Demand $286,480 16,438 kW-months/year $17.43
Electricity Fees $32,462 - $ -
Natural Gas $168,145 11,899 MMBtu $14.13
TOTAL ENERGY COSTS $925,319
RECOMMENDED SAVINGS* $414,731 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$271,104
Cost:
$1,391,144
$218,361 1,902,137 $52,743 3,026 - - $218,361
1,902,137
kWh
$52,743
3,026
kW-months/year
-
-
MMBtu
02: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$63,711
Cost:
$90,000
$(-90,508) (-788,400) $(-9,411) (-540) $163,630 11,579 $(-90,508)
(-788,400)
kWh
$(-9,411)
(-540)
kW-months/year
$163,630
11,579
MMBtu
03: 2.1224 REPLACE BOILER Savings:
$25,947
Cost:
$36,000
$(-45,053) (-392,448) $(-4,685) (-269) $75,685 5,356 $(-45,053)
(-392,448)
kWh
$(-4,685)
(-269)
kW-months/year
$75,685
5,356
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,971
Cost:
$39,000
$21,507 187,342 $464 27 - - $21,507
187,342
kWh
$464
27
kW-months/year
-
-
MMBtu
05: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$12,483
Cost:
$22,000
- - $12,483 716 - - -
-
kWh
$12,483
716
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,433
Cost:
$1,500
$9,429 82,134 $2,004 115 - - $9,429
82,134
kWh
$2,004
115
kW-months/year
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,491
Cost:
-
$5,346 46,568 $1,145 66 - - $5,346
46,568
kWh
$1,145
66
kW-months/year
-
-
MMBtu
08: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$1,591
Cost:
$5,000
$964 8,394 $627 36 - - $964
8,394
kWh
$627
36
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$414,731
Cost:
$1,584,644
$120,046 1,045,727 $55,370 3,177 $239,315 16,935 $120,046
1,045,727
kWh
$55,370
3,177
kW-months/year
$239,315
16,935
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas