IAC logo
IAC Assessment: CI0033
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CI0033
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of California, Irvine
Assessment Year 2024
Principal Product Auto Engine Components
NAICS 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3592 - Carburetors, Pistons, Rings, Valves
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 71,000
Annual Production 1,500,000 Pieces
Production Hrs. Annual 6,783
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $456,538 5,500,721 kWh $0.08
Electricity Demand $246,438 11,099 kW-months/year $22.20
Electricity Fees $106,524 - $ -
LPG $20,826 357 MMBtu $58.34
TOTAL ENERGY COSTS $830,326
RECOMMENDED SAVINGS* $182,959 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$104,681
Cost:
$874,600
$78,574 946,680 $26,107 1,176 - - - - - - $78,574
946,680
kWh
$26,107
1,176
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$27,212
Cost:
$6,000
$23,882 287,737 $3,330 150 - - - - - - $23,882
287,737
kWh
$3,330
150
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$18,262
Cost:
$72,000
$18,262 220,029 - - - - - - - - $18,262
220,029
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$15,193
Cost:
$60,000
$(-3,635) (-43,800) $(-1,998) (-90) $20,826 357 - - - - $(-3,635)
(-43,800)
kWh
$(-1,998)
(-90)
kW-months/year
$20,826
357
MMBtu
-
-
$
-
-
$
05: 2.7262 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS Savings:
$10,622
Cost:
$800
$10,622 127,980 - - - - - - - - $10,622
127,980
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$5,863
Cost:
$5,400
$2,105 25,361 $3,155 142 - - $548 - $55 - $2,105
25,361
kWh
$3,155
142
kW-months/year
-
-
MMBtu
$548
-
$
$55
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,126
Cost:
$780
$831 10,013 $295 13 - - - - - - $831
10,013
kWh
$295
13
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$182,959
Cost:
$1,019,580
$130,641 1,574,000 $30,889 1,391 $20,826 357 $548 - $55 - $130,641
1,574,000
kWh
$30,889
1,391
kW-months/year
$20,826
357
MMBtu
$548
-
$
$55
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand LPG Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Personnel Changes Ancillary Material Cost