IAC Assessment: CI0050
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CI0050
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of California, Irvine
Assessment Year 2025
Principal Product In-Flight Entertainment Systems
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $100,000,000-$500,000,000
# of Employees 168
Plant Area (Sq.Ft.) 71,656
Annual Production 1,000,000 Units
Production Hrs. Annual 2,340
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $154,035 1,436,707 kWh $0.11
Electricity Demand $132,380 7,362 kW-months/year $17.98
Electricity Fees $7,705 - $ -
Natural Gas $9,502 763 MMBtu $12.45
Other Gas $1,318 1 MMBtu $1,318.00
TOTAL ENERGY COSTS $307,467
RECOMMENDED SAVINGS* $195,625 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$87,810
Cost:
$829,924
$67,572 630,336 $20,238 1,126 $67,572
630,336
kWh
$20,238
1,126
kW-months/year
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$45,303
Cost:
$310,000
$35,287 329,173 $10,016 557 $35,287
329,173
kWh
$10,016
557
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$41,763
Cost:
$5,000
$34,607 322,827 $7,156 398 $34,607
322,827
kWh
$7,156
398
kW-months/year
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$8,212
Cost:
$3,000
$7,006 65,350 $1,206 67 $7,006
65,350
kWh
$1,206
67
kW-months/year
05: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$7,726
Cost:
$11,000
- - $7,726 430 -
-
kWh
$7,726
430
kW-months/year
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,037
Cost:
$120
- - $2,037 113 -
-
kWh
$2,037
113
kW-months/year
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,562
Cost:
$1,012
$613 5,720 $949 53 $613
5,720
kWh
$949
53
kW-months/year
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,212
Cost:
$150
$1,212 11,303 - - $1,212
11,303
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$195,625
Cost:
$1,160,206
$146,297 1,364,709 $49,328 2,744 $146,297
1,364,709
kWh
$49,328
2,744
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand