IAC Assessment: CL1807
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Clemson University
Assessment Year 2018
Principal Product High Speed Drill Bits
NAICS 333515 - Cutting Tool and Machine Tool Accessory Manufacturing
SIC 3545 - Machine Tool Accessories
Sales $100,000,000-$500,000,000
# of Employees 309
Plant Area (Sq.Ft.) 200,000
Annual Production 2,740,086 Pounds
Production Hrs. Annual 8,760
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $873,520 14,436,000 kWh $0.06
Electricity Demand $66,387 5,060 kW-months/year $13.12
Natural Gas $39,299 5,183 MMBtu $7.58
TOTAL ENERGY COSTS $979,206
RECOMMENDED SAVINGS* $108,694 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$51,068
Cost:
$500
$51,068 865,560 - - - - - - $51,068
865,560
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$38,713
Cost:
$42,563
$29,756 504,332 $8,957 683 - - - - $29,756
504,332
kWh
$8,957
683
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$13,718
Cost:
$15,500
$10,512 178,178 $3,206 244 - - - - $10,512
178,178
kWh
$3,206
244
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$3,717
Cost:
$3,050
- - - - - - $3,717 356,300 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,717
356,300
Tgal
05: 2.1224 REPLACE BOILER Savings:
$1,478
Cost:
$750
- - - - $1,478 197 - - -
-
kWh
-
-
kW-months/year
$1,478
197
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$108,694
Cost:
$62,363
$91,336 1,548,070 $12,163 927 $1,478 197 $3,717 356,300 $91,336
1,548,070
kWh
$12,163
927
kW-months/year
$1,478
197
MMBtu
$3,717
356,300
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage