Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Clemson University
Assessment Year 2020
Principal Product Various composite products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $50,000,000-$100,000,000
# of Employees 225
Plant Area (Sq.Ft.) 350,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 2,600
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $114,651 1,026,220 kWh $0.11
Electricity Demand $769 1,083 kW-months/year $0.71
Electricity Fees $11,805 - $ -
Natural Gas $4,289 414 MMBtu $10.35
TOTAL ENERGY COSTS $132,464
RECOMMENDED SAVINGS* $15,497 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,404
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$206
Cost:
$230
$206 1,843 - - $206
1,843
kWh
-
-
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,804
Cost:
$2,100
$8,783 78,612 $21 30 $8,783
78,612
kWh
$21
30
kW-months/year
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,093
Cost:
-
- - $3,093 4,385 -
-
kWh
$3,093
4,385
kW-months/year
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,387
Cost:
-
$1,387 12,410 - - $1,387
12,410
kWh
-
-
kW-months/year
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,006
Cost:
$789
$1,949 17,449 $57 81 $1,949
17,449
kWh
$57
81
kW-months/year
TOTAL RECOMMENDED Savings:
$15,497
Cost:
$3,119
$12,325 110,315 $3,172 4,496 $12,325
110,315
kWh
$3,172
4,496
kW-months/year
TOTAL IMPLEMENTED Savings:
$12,404
Cost:
$3,119
$12,325 110,315 $79 111 $12,325
110,315
kWh
$79
111
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand