Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Clemson University
Assessment Year 2021
Principal Product Plastic Extrusions
NAICS 326160 - Plastics Bottle Manufacturing
SIC 3085 - Plastics Bottles
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 125,000
Annual Production 6,900,000 Units
Production Hrs. Annual 8,400
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $547,632 16,682,941 kWh $0.03
Electricity Demand $382,179 33,664 kW-months/year $11.35
Electricity Fees $10,838 - $ -
Natural Gas $10,340 1,337 MMBtu $7.73
TOTAL ENERGY COSTS $974,817
RECOMMENDED SAVINGS* $94,114 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,537
Cost:
-
$2,356 71,766 $1,181 104 $2,356
71,766
kWh
$1,181
104
kW-months/year
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,148
Cost:
$1,615
$1,148 34,794 - - $1,148
34,794
kWh
-
-
kW-months/year
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$12,331
Cost:
-
$8,268 250,555 $4,063 358 $8,268
250,555
kWh
$4,063
358
kW-months/year
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$10,678
Cost:
$4,250
$10,678 323,590 - - $10,678
323,590
kWh
-
-
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$66,420
Cost:
$37,500
$62,521 1,894,564 $3,899 344 $62,521
1,894,564
kWh
$3,899
344
kW-months/year
TOTAL RECOMMENDED Savings:
$94,114
Cost:
$43,365
$84,971 2,575,269 $9,143 806 $84,971
2,575,269
kWh
$9,143
806
kW-months/year
TOTAL IMPLEMENTED Savings:
-