IAC logo
IAC Assessment: CM1005
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CM1005
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado School of Mines
Assessment Year 2022
Principal Product Office Leasing
NAICS 531190 - Lessors of Other Real Estate Property
SIC 6519 - Real Property Lessors, Nec
Sales $1,000,000-$5,000,000
# of Employees 3
Plant Area (Sq.Ft.) 108,700
Annual Production 80,000 Units
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $110,571 2,592,000 kWh $0.04
Electricity Demand $93,504 4,853 kW-months/year $19.27
Natural Gas $15,500 2,411 MMBtu $6.43
TOTAL ENERGY COSTS $219,575
RECOMMENDED SAVINGS* $83,422 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $83,422
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$41,100
Cost:
$630,000
$6,400 150,000 $34,700 1,800 - - - - $6,400
150,000
kWh
$34,700
1,800
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$15,820
Cost:
$50,000
$13,320 312,000 $2,500 130 - - - - $13,320
312,000
kWh
$2,500
130
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.7493 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES Savings:
$11,022
Cost:
$275,000
$2,733 64,000 $5,395 280 $2,894 450 - - $2,733
64,000
kWh
$5,395
280
kW-months/year
$2,894
450
MMBtu
-
-
Tgal
04: 3.4151 MINIMIZE WATER USAGE Savings:
$7,800
Cost:
$15,900
- - - - - - $7,800 850 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,800
850
Tgal
05: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$3,000
Cost:
$125
$2,760 64,700 $240 12 - - - - $2,760
64,700
kWh
$240
12
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.1224 REPLACE BOILER Savings:
$1,680
Cost:
$4,800
$(-160) (-3,700) $(-260) (-14) $2,100 330 - - $(-160)
(-3,700)
kWh
$(-260)
(-14)
kW-months/year
$2,100
330
MMBtu
-
-
Tgal
07: 2.1224 REPLACE BOILER Savings:
$1,510
Cost:
$14,900
- - - - $1,510 235 - - -
-
kWh
-
-
kW-months/year
$1,510
235
MMBtu
-
-
Tgal
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,490
Cost:
$2,690
$540 12,750 $950 50 - - - - $540
12,750
kWh
$950
50
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$83,422
Cost:
$993,415
$25,593 599,750 $43,525 2,258 $6,504 1,015 $7,800 850 $25,593
599,750
kWh
$43,525
2,258
kW-months/year
$6,504
1,015
MMBtu
$7,800
850
Tgal
TOTAL IMPLEMENTED Savings:
$83,422
Cost:
$993,415
$25,593 599,750 $43,525 2,258 $6,504 1,015 $7,800 850 $25,593
599,750
kWh
$43,525
2,258
kW-months/year
$6,504
1,015
MMBtu
$7,800
850
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage