IAC logo
IAC Assessment: CM1006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CM1006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado School of Mines
Assessment Year 2022
Principal Product Manufacturing Machines
NAICS 333249 - Other Industrial Machinery Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 68,000
Annual Production 20 Units
Production Hrs. Annual 4,380
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,597 1,294,560 kWh $0.04
Electricity Demand $61,113 3,045 kW-months/year $20.07
Electricity Fees $11,994 - $ -
Natural Gas $7,688 1,212 MMBtu $6.34
TOTAL ENERGY COSTS $132,392
RECOMMENDED SAVINGS* $66,932 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,820
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$30,400
Cost:
$894,000
$22,400 562,600 $8,000 400 - - - - - - $22,400
562,600
kWh
$8,000
400
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$2,098
Cost:
$10,625
$18 450 - - - - $2,080 - - - $18
450
kWh
-
-
kW-months/year
-
-
$
$2,080
-
$
-
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$454
Cost:
$25
$400 10,010 $54 3 - - - - - - $400
10,010
kWh
$54
3
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$118
Cost:
-
$70 1,752 $48 2 - - - - - - $70
1,752
kWh
$48
2
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$156
Cost:
$500
$140 3,500 $16 1 - - - - - - $140
3,500
kWh
$16
1
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$4,160
Cost:
$8,000
- - - - $4,160 - - - - - -
-
kWh
-
-
kW-months/year
$4,160
-
$
-
-
$
-
-
$
07: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$29,546
Cost:
$160,998
$(-1,020) (-25,500) $(-84) (-4) - - - - $30,650 - $(-1,020)
(-25,500)
kWh
$(-84)
(-4)
kW-months/year
-
-
$
-
-
$
$30,650
-
$
TOTAL RECOMMENDED Savings:
$66,932
Cost:
$1,074,148
$22,008 552,812 $8,034 402 $4,160 - $2,080 - $30,650 - $22,008
552,812
kWh
$8,034
402
kW-months/year
$4,160
-
$
$2,080
-
$
$30,650
-
$
TOTAL IMPLEMENTED Savings:
$29,820
Cost:
$161,498
$(-810) (-20,248) $(-20) (-1) - - - - $30,650 - $(-810)
(-20,248)
kWh
$(-20)
(-1)
kW-months/year
-
-
$
-
-
$
$30,650
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes