Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado School of Mines |
---|---|
Assessment Year | 2022 |
Principal Product | Wood Cabinetry |
NAICS | 337110 - Wood Kitchen Cabinet and Countertop Manufacturing |
SIC | 2434 - Wood Kitchen Cabinets |
Sales | $1,000,000-$5,000,000 |
# of Employees | 25 |
Plant Area (Sq.Ft.) | 24,500 |
Annual Production | 2,000 Units |
Production Hrs. Annual | 3,120 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $11,550 | 270,720 | kWh | $0.04 |
Electricity Demand | $28,820 | 1,501 | kW-months/year | $19.20 |
Electricity Fees | $3,840 | - | $ | - |
Natural Gas | $7,871 | 1,269 | MMBtu | $6.20 |
TOTAL ENERGY COSTS | $52,081 | |||
RECOMMENDED SAVINGS* | $26,785 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $8,130 Cost: $125,000 |
$6,430 | 150,500 | $1,700 | 88 | - | - | - | - |
$6,430 150,500 kWh |
$1,700 88 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,395 Cost: $34,000 |
$1,540 | 36,900 | $3,000 | 156 | - | - | $855 | - |
$1,540 36,900 kWh |
$3,000 156 kW-months/year |
- - lb |
$855 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,520 Cost: $525 |
$1,500 | 35,600 | $2,800 | 140 | - | - | $(-780) | - |
$1,500 35,600 kWh |
$2,800 140 kW-months/year |
- - lb |
$(-780) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,140 Cost: $13,500 |
$1,000 | 24,000 | $2,140 | 112 | - | - | - | - |
$1,000 24,000 kWh |
$2,140 112 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $2,900 Cost: - |
- | - | - | - | $2,900 | 260 | - | - |
- - kWh |
- - kW-months/year |
$2,900 260 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $3,700 Cost: $8,000 |
- | - | - | - | - | - | $3,700 | - |
- - kWh |
- - kW-months/year |
- - lb |
$3,700 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $26,785 Cost: $181,025 |
$10,470 | 247,000 | $9,640 | 496 | $2,900 | 260 | $3,775 | - | $10,470 247,000 kWh |
$9,640 496 kW-months/year |
$2,900 260 lb |
$3,775 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes |