IAC logo
IAC Assessment: CM1024
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CM1024
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado School of Mines
Assessment Year 2023
Principal Product Model Rocket Engines
NAICS 333249 - Other Industrial Machinery Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 133,500
Annual Production 150,000 Units
Production Hrs. Annual 2,730
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,761 882,400 kWh $0.07
Electricity Demand $68,393 3,542 kW-months/year $19.31
Electricity Fees $12,149 - $ -
Natural Gas $55,854 6,237 MMBtu $8.96
TOTAL ENERGY COSTS $195,157
RECOMMENDED SAVINGS* $45,766 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$28,381
Cost:
$291,962
$25,137 377,472 $3,244 168 - - - - $25,137
377,472
kWh
$3,244
168
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,939
Cost:
$6,474
$2,518 37,820 $3,421 177 - - - - $2,518
37,820
kWh
$3,421
177
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,832
Cost:
$36,480
$1,255 18,827 $1,411 73 $166 19 - - $1,255
18,827
kWh
$1,411
73
kW-months/year
$166
19
MMBtu
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$843
Cost:
$17,694
$387 5,797 $456 24 - - - - $387
5,797
kWh
$456
24
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$760
Cost:
$75
$335 5,016 $425 22 - - - - $335
5,016
kWh
$425
22
kW-months/year
-
-
MMBtu
-
-
$
06: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$7,011
Cost:
$8,000
- - - - - - $7,011 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,011
-
$
TOTAL RECOMMENDED Savings:
$45,766
Cost:
$360,685
$29,632 444,932 $8,957 464 $166 19 $7,011 - $29,632
444,932
kWh
$8,957
464
kW-months/year
$166
19
MMBtu
$7,011
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes