IAC logo
IAC Assessment: CM1036
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CM1036
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado School of Mines
Assessment Year 2024
Principal Product Polybutadiene Resins
NAICS 325212 - Synthetic Rubber Manufacturing
SIC 2822 - Synthetic Rubber
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 35,566
Annual Production 1,825 Tons
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,494 1,325,059 kWh $0.05
Electricity Demand $47,445 2,462 kW-months/year $19.27
Electricity Fees $14,408 - $ -
Natural Gas $85,150 12,945 MMBtu $6.58
TOTAL ENERGY COSTS $210,497
RECOMMENDED SAVINGS* $10,313 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$4,303
Cost:
$55,212
$2,197 45,847 $743 38 $1,363 207 - - $2,197
45,847
kWh
$743
38
kW-months/year
$1,363
207
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,289
Cost:
$11,963
$1,052 21,955 $1,237 64 - - - - $1,052
21,955
kWh
$1,237
64
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$800
Cost:
$12,180
$235 4,894 $566 29 - - - - $235
4,894
kWh
$566
29
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$204
Cost:
$796
$204 4,262 - - - - - - $204
4,262
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$36
Cost:
$146
$6 119 - - $30 5 - - $6
119
kWh
-
-
kW-months/year
$30
5
MMBtu
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$155
Cost:
$428
- - - - $155 24 - - -
-
kWh
-
-
kW-months/year
$155
24
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,525
Cost:
$116
- - - - - - $2,525 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,525
-
$
TOTAL RECOMMENDED Savings:
$10,313
Cost:
$80,841
$3,693 77,077 $2,546 132 $1,549 235 $2,525 - $3,693
77,077
kWh
$2,546
132
kW-months/year
$1,549
235
MMBtu
$2,525
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost