IAC logo
IAC Assessment: CO0003
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0003
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1984
Principal Product MILK,SOUR CREAM,ICE CREAM
NAICS n/a
SIC 2026 - Fluid Milk
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 0
Annual Production 6,600,000 Pounds
Production Hrs. Annual 2,860
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,284 557,151 kWh $0.06
Natural Gas $17,714 4,169 MMBtu $4.25
TOTAL ENERGY COSTS $48,998
RECOMMENDED SAVINGS* $13,990 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,990
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,060
Cost:
$300
- - $5,060 1,026 - - -
-
kWh
$5,060
1,026
MMBtu
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,272
Cost:
$2,500
- - $1,272 258 - - -
-
kWh
$1,272
258
MMBtu
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$594
Cost:
$118
$594 10,551 - - - - $594
10,551
kWh
-
-
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,430
Cost:
$500
$2,130 37,808 $(-700) (-142) - - $2,130
37,808
kWh
$(-700)
(-142)
MMBtu
-
-
$
05: 2.1222 INSTALL TURBULATORS Savings:
$1,594
Cost:
$1,100
- - $1,594 323 - - -
-
kWh
$1,594
323
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$435
Cost:
$800
- - $435 88 - - -
-
kWh
$435
88
MMBtu
-
-
$
07: 2.2711 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING Savings:
$410
Cost:
$300
$410 7,327 - - - - $410
7,327
kWh
-
-
MMBtu
-
-
$
08: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$1,765
Cost:
$1,494
- - $1,055 214 $710 - -
-
kWh
$1,055
214
MMBtu
$710
-
$
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,045
Cost:
$635
- - $1,045 212 - - -
-
kWh
$1,045
212
MMBtu
-
-
$
10: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH Savings:
$385
Cost:
$1,494
- - $385 78 - - -
-
kWh
$385
78
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$13,990
Cost:
$9,241
$3,134 55,686 $10,146 2,057 $710 - $3,134
55,686
kWh
$10,146
2,057
MMBtu
$710
-
$
TOTAL IMPLEMENTED Savings:
$13,990
Cost:
$9,241
$3,134 55,686 $10,146 2,057 $710 - $3,134
55,686
kWh
$10,146
2,057
MMBtu
$710
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes