IAC Assessment: CO0019
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0019
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1985
Principal Product MOBILE HOMES
NAICS n/a
SIC 2451 - Mobile Homes
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 0
Annual Production 300 Pieces
Production Hrs. Annual 2,210
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,390 366,940 kWh $0.07
Natural Gas $21,151 4,473 MMBtu $4.73
TOTAL ENERGY COSTS $46,541
RECOMMENDED SAVINGS* $11,297 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,101
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$568
Cost:
$353
$568 8,206 - - $568
8,206
kWh
-
-
MMBtu
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,533
Cost:
$3,200
- - $1,533 324 -
-
kWh
$1,533
324
MMBtu
03: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$1,278
Cost:
$2,000
$1,278 18,464 - - $1,278
18,464
kWh
-
-
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,121
Cost:
$218
$162 2,345 $3,959 837 $162
2,345
kWh
$3,959
837
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,572
Cost:
$4,000
$3,630 52,462 $(-1,058) (-224) $3,630
52,462
kWh
$(-1,058)
(-224)
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$657
Cost:
$1,200
- - $657 139 -
-
kWh
$657
139
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$568
Cost:
$30
$568 8,206 - - $568
8,206
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$11,297
Cost:
$11,001
$6,206 89,683 $5,091 1,076 $6,206
89,683
kWh
$5,091
1,076
MMBtu
TOTAL IMPLEMENTED Savings:
$2,101
Cost:
$3,553
$568 8,206 $1,533 324 $568
8,206
kWh
$1,533
324
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas