IAC Assessment: CO0043
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0043
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1985
Principal Product BRICKS & CINDER BLOCKS
NAICS n/a
SIC 3271 - Concrete Block And Brick
Sales $5,000,000-$10,000,000
# of Employees 42
Plant Area (Sq.Ft.) 0
Annual Production 7,000,000 Pieces
Production Hrs. Annual 3,172
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,441 995,018 kWh $0.08
Natural Gas $104,510 23,109 MMBtu $4.52
Other Energy $33,967 3,575 MMBtu $9.50
TOTAL ENERGY COSTS $214,918
RECOMMENDED SAVINGS* $18,756 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,724
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Electricity Usage Natural Gas Other Energy
$ kWh $ MMBtu $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,067
Cost:
$275
- - $4,067 900 - - -
-
kWh
$4,067
900
MMBtu
-
-
MMBtu
02: 2.1222 INSTALL TURBULATORS Savings:
$1,154
Cost:
$800
- - $1,154 255 - - -
-
kWh
$1,154
255
MMBtu
-
-
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,384
Cost:
$10,000
- - $4,384 970 - - -
-
kWh
$4,384
970
MMBtu
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$743
Cost:
$150
$743 9,672 - - - - $743
9,672
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$398
Cost:
$150
$398 5,275 - - - - $398
5,275
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,663
Cost:
$1,620
- - $3,663 810 - - -
-
kWh
$3,663
810
MMBtu
-
-
MMBtu
07: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$512
Cost:
$1,799
- - $512 113 - - -
-
kWh
$512
113
MMBtu
-
-
MMBtu
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$297
Cost:
$295
- - $297 66 - - -
-
kWh
$297
66
MMBtu
-
-
MMBtu
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$178
Cost:
$50
$178 2,345 - - - - $178
2,345
kWh
-
-
MMBtu
-
-
MMBtu
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,316
Cost:
$50
$1,316 17,292 - - - - $1,316
17,292
kWh
-
-
MMBtu
-
-
MMBtu
11: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE Savings:
$1,358
Cost:
$100
- - - - $1,358 143 -
-
kWh
-
-
MMBtu
$1,358
143
MMBtu
12: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$686
Cost:
$564
$686 9,086 - - - - $686
9,086
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$18,756
Cost:
$15,853
$3,321 43,670 $14,077 3,114 $1,358 143 $3,321
43,670
kWh
$14,077
3,114
MMBtu
$1,358
143
MMBtu
TOTAL IMPLEMENTED Savings:
$11,724
Cost:
$4,953
$1,827 24,033 $8,539 1,889 $1,358 143 $1,827
24,033
kWh
$8,539
1,889
MMBtu
$1,358
143
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Other Energy Electricity Usage Natural Gas Other Energy