Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1986 |
Principal Product | BULK AND PACKAGED FLOUR |
NAICS | n/a |
SIC | 2041 - Flour And Other Grain Mill Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 1,800 Tons |
Production Hrs. Annual | 7,488 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $778,498 | 16,123,974 | kWh | $0.05 |
Natural Gas | $45,593 | 9,532 | MMBtu | $4.78 |
TOTAL ENERGY COSTS | $824,091 | |||
RECOMMENDED SAVINGS* | $87,763 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $64,882 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $30,451 Cost: - |
$30,451 | 630,715 | - | - | - | - |
$30,451 630,715 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $20,376 Cost: $21,600 |
$20,376 | 422,040 | - | - | - | - |
$20,376 422,040 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $15,180 Cost: $3,000 |
$(-910) | (-19,050) | $16,090 | 3,366 | - | - |
$(-910) (-19,050) kWh |
$16,090 3,366 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,061 Cost: $200 |
$7,061 | 146,249 | - | - | - | - |
$7,061 146,249 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $3,212 Cost: $800 |
- | - | $3,212 | 672 | - | - |
- - kWh |
$3,212 672 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $2,876 Cost: $4 |
$453 | 9,379 | $2,423 | 507 | - | - |
$453 9,379 kWh |
$2,423 507 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $2,505 Cost: $600 |
$2,505 | - | - | - | - | - |
$2,505 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $1,183 Cost: - |
- | - | - | - | $1,183 | - |
- - kWh |
- - MMBtu |
$1,183 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $999 Cost: $300 |
- | - | $999 | 209 | - | - |
- - kWh |
$999 209 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $382 Cost: $50 |
$382 | 7,913 | - | - | - | - |
$382 7,913 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $3,538 Cost: $1,879 |
$3,538 | 73,271 | - | - | - | - |
$3,538 73,271 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $87,763 Cost: $28,433 |
$63,856 | 1,270,517 | $22,724 | 4,754 | $1,183 | - | $63,856 1,270,517 kWh |
$22,724 4,754 MMBtu |
$1,183 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $64,882 Cost: $6,233 |
$40,975 | 848,477 | $22,724 | 4,754 | $1,183 | - | $40,975 848,477 kWh |
$22,724 4,754 MMBtu |
$1,183 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |