IAC Assessment: CO0073
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0073
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1986
Principal Product BULK AND PACKAGED FLOUR
NAICS n/a
SIC 2041 - Flour And Other Grain Mill Products
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 1,800 Tons
Production Hrs. Annual 7,488
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $778,498 16,123,974 kWh $0.05
Natural Gas $45,593 9,532 MMBtu $4.78
TOTAL ENERGY COSTS $824,091
RECOMMENDED SAVINGS* $87,763 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $64,882
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$30,451
Cost:
-
$30,451 630,715 - - - - $30,451
630,715
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$20,376
Cost:
$21,600
$20,376 422,040 - - - - $20,376
422,040
kWh
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$15,180
Cost:
$3,000
$(-910) (-19,050) $16,090 3,366 - - $(-910)
(-19,050)
kWh
$16,090
3,366
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,061
Cost:
$200
$7,061 146,249 - - - - $7,061
146,249
kWh
-
-
MMBtu
-
-
$
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$3,212
Cost:
$800
- - $3,212 672 - - -
-
kWh
$3,212
672
MMBtu
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,876
Cost:
$4
$453 9,379 $2,423 507 - - $453
9,379
kWh
$2,423
507
MMBtu
-
-
$
07: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,505
Cost:
$600
$2,505 - - - - - $2,505
-
kWh
-
-
MMBtu
-
-
$
08: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$1,183
Cost:
-
- - - - $1,183 - -
-
kWh
-
-
MMBtu
$1,183
-
$
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$999
Cost:
$300
- - $999 209 - - -
-
kWh
$999
209
MMBtu
-
-
$
10: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$382
Cost:
$50
$382 7,913 - - - - $382
7,913
kWh
-
-
MMBtu
-
-
$
11: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,538
Cost:
$1,879
$3,538 73,271 - - - - $3,538
73,271
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$87,763
Cost:
$28,433
$63,856 1,270,517 $22,724 4,754 $1,183 - $63,856
1,270,517
kWh
$22,724
4,754
MMBtu
$1,183
-
$
TOTAL IMPLEMENTED Savings:
$64,882
Cost:
$6,233
$40,975 848,477 $22,724 4,754 $1,183 - $40,975
848,477
kWh
$22,724
4,754
MMBtu
$1,183
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes